Initial purchase quotations are created in status “New”. In that status, all parts of the quotation can be modified.
To finalise the step of creating the quotation, the status of the quotation should be changed to “Ready”.
Status change is possible when the quotation is in change mode by using buttons in Status Control group on the right top part of the form.
After this step status of quotation is changed to “Ready” which means that the creation step has been completed.