The following fields are standard to either type of meter.
RT Description
Free format text field to describe this Run Time Schedule.
Active
Indicates if this is an Active Schedule Active (ticked) is the Default.
Reading Point
Identifies the Reading Point, set up earlier
Meter Type
Identifies the Meter Type associated with the Reading Point. The Meter Type determines which version of the screen is displayed.
Last Trigger Value
Has to be set to last value used to trigger the Run Time Schedule In the case of a new Meter /Asset this would normally set to 0.
Last Trigger Date
Set to the date of the Last Trigger Value. In the case of a new Meter /Asset this would normally set to the Installation Date.